Product Categories:
Sign up for our Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon
Email Newsletter

Contact Us Today!

Sales: 800-423-2322
Office: 561-744-7572
Fax: 561-744-1475
Email: info@czlabs.com

Assembly Instructions

Slide clamp nut and clamp gasket over cable end. V-groove in clamp gasket faces toward connector body. Strip calbe to dimensions shown. Important: Do not nick insulation around center conductors. For solid core cables, lay braid back out of the way while trimming core; then lay braid down again to facilitate Step 2.


Slide braid clamp over braid until inner shoulder butts against jacket. (Note: sharp edge of braid clamp goes toward V-groove in clamp gasket.) Fold braid back evenly over braid clamp as shown.


Slide sleeve over cable so that braid "bottoms" inside sleeve. Solder contacts to conductors, using minimum heat. Remove any excess solder. Alternative method: Crimp center contacts. Bend conductors and contacts out and back to obtain .250" (6.4mm) spacing between contacts.


Insert contact into rear of insulator, (Note: for Belden 9207 and similar solid core cables, contact on bare copper conductor (or for Belden 8227 and similar air dielectric cables) the contact on white insulated conductor goes into hole with dot next to it. Slide insulator to butt against sleeve as shown.


Insert assembly into connector body, aligning slot of insulator with polarizing key in body. Tighten clamp nut to 50lb/in (5.7 N-m) torque. Do not twist connector body.

 

Connector Assembly & Termination Instructions

UHF Solder Type
UHF Crimp - 3 piece
Mini UHF Crimp - 3 piece
Drop Cable Preparations

"N" Solder Clamp
TNC Crimp - 3 piece
TNC Crimp - 2 piece
Twinax Crimp/Solder

BNC Twist On - 1 piece
BNC Solder - 3 piece
BNC Crimp - 3 piece
BNC Crimp - 2 piece